Demo access Jobs & Careers Shop

How is LMRA linked to the risk assessment?

Two systems – one goal: safety in focus

The Last Minute Risk Assessment (LMRA) supplements the classic risk assessment (GBU) in sam®. While the GBU assesses risks and defines measures in the long term, the LMRA checks in the short term whether the situation on site has changed.

This is how the link works:

  • Hazards from the GBU are automatically transferred to the LMRA.
  • Answers and measures are fed back into the GBU evaluation.
  • Anomalies can be directly converted into measures.

This combination creates a holistic cycle of analysis, reflection and prevention – occupational health and safety is kept dynamic and up-to-date.

Now call us
call us!
Click here...
+49 5971 793 70 20
or
We'll call
you back!
Enter number here:
We will get back to you as soon as possible.
0
    0
    Warenkorb
    Warenkorb ist leerZurück zum Shop